OVERVIEW:Wilder Ecological was sub-contracted to effect a USFWS clearance for desert tortoise, western burrowing owl, and desert kit fox on a 667-acre photovoltaic project, and completed a successful translocation of 11 desert tortoises during a compressed fall season time line.
SERVICES INCLUDED:Developing a Desert Tortoise Translocation Plan
Coordination with Agencies (CDFW and USFWS) on permitting
Clearance surveys for sensitive species
Mojave desert tortoise
Western burrowing owl
Desert kit fox
Passive relocation of kit fox and owls
USFWS protocol desert tortoise health assessments (including samples collection)
Successful translocation of 11 desert tortoises during a compressed fall season time line
Ongoing research and monitoring contract to track the translocated tortoises for a scheduled period of five years
Reporting for permit compliance
Wilder was sub-contracted to provide field leadership, data processing, and GIS for clearance surveys for desert tortoise on approximately 150,000 acres, followed by translocation of resident animals, then continued long-term tracking through radio telemetry and ongoing yearly USFWS health assessments.
Wilder conducted desert tortoise clearance surveys on 36 square miles of US Army training lands yielded more than 500 animals.
Wilder conducted clearance surveys, mitigation, and construction monitoring on a 3,440 acre 450MW solar site.
Wilder was contracted to conduct aerial drone surveys and ground-based raven population mitigation through use of egg-oiling techniques.
Nate Jones was contracted to serve as Project Field Lead on 3,500+ acres of photovoltaic solar development.
Wilder was sub-contracted to provide a USFWS Desert Tortoise Authorized Biologist to assist in environmental compliance monitoring during a two-year upgrade to the 27 MW Alta Mesa Wind Project.
Wilder Ecological was sub-contracted to effect a USFWS clearance for desert tortoise, western burrowing owl, and desert kit fox on a 667-acre photovoltaic project, and completed a successful translocation of 11 desert tortoises during a compressed fall season time line.
Ivanpah Solar Electric Generating Station (ISEGS) is a 377 MW solar thermal power plant, constructed on 3,500 acres of BLM land. At the time of construction, it was the largest such power plant in the world.