OVERVIEWWilder biologists Nate Jones and Liana Harp conducted clearance surveys, mitigation, and construction monitoring on a 3,440 acre 450MW solar site.
Working on a multi-company team, Wilder was sub-contracted to supply qualified biologists for clearance surveys, wildlife mitigation actions, and biological monitoring for the construction of a 450MW photovoltaic solar power generation facility built on 3,440 acres of public and private land in southeast California.
SERVICES INCLUDED:Qualified biologists participated in pre-construction biological mitigation activities
Desert tortoise clearance surveys
Nesting bird surveys
Burrowing owl surveys and passive relocation action
Desert kit fox passive relocation actions
Rare plant mitigation monitoring
Qualified biologists subsequently served as compliance monitors during construction activities
Wildlife exclusion perimeter fencing
ground clearance and installation of photovoltaic solar power generating facilities
Transmission tie-in to nearby substation and interstate electric line
SEE MORE CASE STUDIES:Wilder was sub-contracted to provide field leadership, data processing, and GIS for clearance surveys for desert tortoise on approximately 150,000 acres, followed by translocation of resident animals, then continued long-term tracking through radio telemetry and ongoing yearly USFWS health assessments.
Wilder conducted desert tortoise clearance surveys on 36 square miles of US Army training lands yielded more than 500 animals.
Wilder conducted clearance surveys, mitigation, and construction monitoring on a 3,440 acre 450MW solar site.
Wilder was contracted to conduct aerial drone surveys and ground-based raven population mitigation through use of egg-oiling techniques.
Nate Jones was contracted to serve as Project Field Lead on 3,500+ acres of photovoltaic solar development.
Wilder was sub-contracted to provide a USFWS Desert Tortoise Authorized Biologist to assist in environmental compliance monitoring during a two-year upgrade to the 27 MW Alta Mesa Wind Project.
Wilder Ecological was sub-contracted to effect a USFWS clearance for desert tortoise, western burrowing owl, and desert kit fox on a 667-acre photovoltaic project, and completed a successful translocation of 11 desert tortoises during a compressed fall season time line.
Ivanpah Solar Electric Generating Station (ISEGS) is a 377 MW solar thermal power plant, constructed on 3,500 acres of BLM land. At the time of construction, it was the largest such power plant in the world.